Thursday 1 June 2023

What I've done this week

 This week I completed most of my CAD (Computer Assisted Drawing) Work, also helped out the lvl2s with their retaining wall and its nearly completed. the yr13s Marked out the new site where we are building a new shed for the new school vans and so far we have run into some tree roots where we are looking to place the sheds.


       This is our P.E shed the we have built 

2 comments:

  1. I understand you have two possible sites for the van sheds. Which site do you think will work better? Why?

    ReplyDelete
  2. Kerry Boyde-Preece22 June 2023 at 08:59

    Tēnā koe DJ

    You are getting through some serious work here, well done, DJ!
    I'm intrigued to see what you've created in CAD, can you share that in your new post?
    Marking out the site is so important, once that is right most things fall into place. I know exactly what you're talking about with tree roots. I have some big Totara trees on my place with huge roots. I ran into a problem a few years ago when the builder was adding some stairs onto the side of the house. We changed to the design of the stairs to accommodate the tree. I figured the tree had been there a lot longer than I had so it made sense to work around it.

    The shed looks great. Is it going to have any heating or plumbing? Wiring? Do you get involved in that too?